Johns Manville Roofing System CAD Details Search using keywords: anchored foundation walls
E-FW-B4 Base Tie-In - Fastener & Plate On Wall
3E-FW-B8 Base Tie In (Polymer Batten Strip) on Wall 6 inch Sealing Strip
3E-DV-05 Through Wall Welded Scupper Sleeve
3E-DV-05I Through Wall Welded Scupper Sleeve
3E-DV-06 Wall Overflow Welded Scupper Sleeve
3E-DV-06I Wall Overflow Welded Scupper Sleeve
E-DV-03 Through-Wall Scupper
E-DV-04 Through-Wall Scupper
E-DV-04I Through-Wall Scupper
E-DV-06 Low Wall Primary Scupper Flashing
3E-EJ-01 EJ Roof to Wall with RTS Strip
3E-EJ-02 EJ Roof to Wall with 6 inch Sealing Strip
3E-EJ-05 Expand-O-Flash Curb to Wall EJ Cover (RTS)
3E-EJ-06 Expand-O-Flash Curb to Wall EJ 6 inch Sealing Strip
E-EJ-01 Expansion Joint - Roof To Wall
E-EJ-03 Expand-O-Flash Curb To Wall Expansion Joint Cover- Style CF/EJ
E-EJ-05 Expand-O-Flash Roof To Wall - Style EJ
E-EJ-07 Expand-O-Flash Curb To Wall Expansion Joint Cover - Style CF/EJ
E-EJ-09 Expand-O-Flash Curb To Wall - Style EJ/WC
E-EJ-12 EJ Roof to Wall with 6 inch Sealing Strip
E-EJ-13 EJ Roof to Wall with 6 inch Seam Tape
3E-FC-14 Inside Corner with Separate Wall Flashing
3E-FC-14I Inside Corner with Separate Wall Flashing Installation
E-FC-13 EPDM Inside Corner with Seam Tape and Vertical Wall Fastening
E-FC-14 EPDM Flashing Wall with Term Bar and Corner Coping
E-FW-M1 EPDM Base & Wall Flashing with Coping Master Detail
E-FW-M1I EPDM Base & Wall Flashing with Coping Isometric View Master Detail
3E-MS-03 Lap Splice Under Wall Flashing with Sealing Strip
3E-MS-06 Lap Splice at Wall Flashing with Sealing Strip
E-PT-07 Lightning Rod-Wall Mount
E-PT-09 JM ENRGY Anchor - EPDM
E-PT-10 Hurricane Peel Stop Anchor Bar
3E-FW-I3 Intermediate Termination Below Wall Cladding
E-FW-I4 EPDM Intermediate Termination with Through-Wall Counter Flashing
E-FW-I5 EPDM Intermediate Termination Below Wall Cladding
SPL-EJ-02 Expansion Joint EPDM Roof to Wall
SPL-FW-02 Wall Mounted Ladder EPDM Base Flashing
SPL-FW-04 Deck Mounted Ladder EPDM Base Flashing
SPL-FW-05 Flashing Wall Optional Terminations
3E-FW-T1 Top of Wall Termination with Stone Coping
3E-FW-T2 Presto-Lock Coping Over EPDM
3E-FW-T3 Fabricated Metal Coping Over Adhered EPDM
3E-FW-T4 Presto-Tite Fascia on Sloped Parapet
3E-FW-T5 Presto-Tite Fascia on Flat Parapet
E-FW-T1 Fabricated Metal Coping Over Adhered EPDM
E-FW-T4 Perma-Tite Continuous Cleat Coping System Over EPDM
VB-1 (ALT) JM Vapor Barrier SA - Wall Base Detail - Alt
VB-1 JM Vapor Barrier SA - Wall Base Detail
VB-1 (ALT) JM Vapor Barrier SAR - Wall Base
VB-1 JM Vapor Barrier SAR - Wall Base
P-FW-B2 Base Tie-In - Fastener & Plate - On Wall
P-FW-B6I PVC Fleece backed in RSUA Base & Wall Flashing
P-FW-B7I - PVC Fleece Backed in Two Part UIA Base & Wall Flashing Spatter
PH-FW-B3 Base Tie-In - Fastener & Plate - On Wall
PH-FW-M1 PVC Hybrid Base and Wall Flashing With Coping
PH-FW-M1I PVC Hybrid Base & Wall Flashing with Coping - Isometric View
P-FW-I2 PVC Detail Strip Wall Flashing Attachment with Fastener & Plate
P-FW-I9 PVC Intermediate Termination with Through-Wall Counterflashing
P-FW-I11 PVC Intermediate Termination Below Wall Cladding
P-DV-03 Through-wall Scupper
P-DV-03I Through-wall Scupper
P-DV-05 Low-Wall Primary Scupper Flashing
P-EJ-01 Expansion Joint-Roof To Wall
P-EJ-04 Expand-O-Flash RoofTo Wall - Style EJ
P-EJ-06 Expand-O-Flash Curb To Wall Expansion Joint Cover-Style CF/EJ
P-EJ-07 Expand-O-Flash Curb To Wall Expansion Joint Cover-Style PVC EJ/WC
P-FC-06 Flashing Wall With Term Bar and Corner Coping
P-FW-M1 PVC Base & Wall Flashing with Coping Master Detail
P-FW-M1I PVC Base & Wall Flashing with Coping Isometric View Master Detail
P-FW-M3I PVC Rhinobond Continuous Wall Flashing Isometric View Master Detail
P-FW-M4I PVC Rhinobond Wall Flashing Isometric View Master Detail
P-PT-08 Lightning Rod-Wall Mount
P-PT-11 JM ENRGY ANCHOR - PVC
P-PT-13 Hurricane Peel Stop Anchor Bar
SPL-EJ-01 Expansion Joint TPO or PVC Roof to Wall
SPL-FW-01 Wall Mounted Ladder TPO or PVC Base Flashing
SPL-FW-05 Flashing Wall Optional Terminations
SPL-FW-03 Deck Mounted Ladder TPO or PVC Base Flashing
P-FW-T1 Fabricated Metal Coping Over Adhered PVC
P-FW-T2 Presto Lock Coping System Over PVC
P-FW-T3 Presto-Tite Fascia System On Sloped Parapet
P-FW-T4 Perma-Tite Continuous Cleat Coping System Over PVC
VB-1 JM Vapor Barrier SA - Wall Base Detail
VB-1 (ALT) JM Vapor Barrier SA - Wall Base Detail - Alt
VB-1 JM Vapor Barrier SAR - Wall Base
VB-1 (ALT) JM Vapor Barrier SAR - Wall Base
BIT-1 (NLB) Base Flashing for Non Load Brng Wall-Curb to Wall EJ
BIT-5 Base Flashing for Non Load Bearing Wall & Metal EJ
BIT-1 (LB) Base Flashing for Load Brng Wall with Counterflashing
BIT-2 (WL) Base Flashing for Wall less than 24 inches
BIT-3 (WH) Base Flashing for Wall more than 24 inches with Coping
BIT-3 (WL) Base Flashing for Wall less than 24 inches with Coping
BIT-6 (TH) Base Flashing for Wall more than 24 inches with Coping
BIT-6 (TL) Base Flashing for Wall less than 24 inches with Coping
BIT-15 (E) EPDM Wall Covering with BUR Base Flashing
BIT-15 (E) Alt-EPDM Wall Covering with BUR Base Flashing
BIT-15 (P) PVC Wall Covering with BUR Base Flashing
BIT-15 (T) TPO Wall Covering with BUR Base Flashing
DFE-1 (NLB) Curb to Wall Expansion Joint
DFE-18 JM Energy Anchor - SBS Adhered
DFE-1 (LB) Masonry Wall with Counter Flashing
DFE-2 (LB) Two Ply Base Flashing for LB Masonry Wall Counter Flashing
DFE-2 (PT) Perma Tite Coping
DFE-2 Base Flashing with Surface Mounted Counter Flashing
DFE-3 (WH) Wood Wall > 24" with Coping
DFE-3 (WL) Wood Wall < 24" with Coping
DFE-6 (TH) Masonry Wall > 24" with Coping
DFE-6 (TL) Masonry Wall < 24" with Coping
DFE-15 (ALT) TPO Wall Covering with Bituminous Base Flashing (Alternate)
DFE-15 (E) EPDM Wall Covering with Bituminous Base Flashing
DFE-15 (P) PVC Wall Covering With Bit Base Flashing
DFE-15 (T) TPO Wall Covering with Bituminous Base Flashing
DFE-20 (WH) Gypsum Wall on Metal Studs > 24" w/Coping
DFE-20 (WL) Gypsum Wall on Metal Studs < 24" w/Coping
DFE-24 Base Flashing for Venting Lightweight Concrete
DGE-1 (LB) Masonry With Nailing Facilities
DGE-2 (LB) Two Ply Base Flashing for LB Masonry Wall Counter Flashing
DGE-2 Base Flashing with Surface Mounted Counter Flashing
DGE-3 (HW) Base Flashing for Wood Wall +24 Inches with Coping
DGE-3 (LW) Base Flashing for Wood Wall -24 Inches with Coping
DGE-6 (TH) Tilt-Up, High
DGE-6 (TL) Tilt-Up, Low
DGE-15 Single Ply Wall Covering with BIT Base Flashing
HW-1 (NLB) Base Flashing Curb to Wall EJ
HW-18 JM Energy Anchor
HW-1 (LB) Masonry Wall w/ Counterflashing
HW- 2 (PT) Perma Tite Coping
HW-3 (WH) Wood Wall >24” with Coping
HW-3 (WL) Wood Wall <24” with Coping
HW-6 (TH) Masonry Wall >24” with Coping
HW-6 (TL) Masonry Wall <24” with Coping
HW- 6 (TL) ALT - Base Flashing For Masonry Wall
HW-15 (E) EPDM Wall Covering with Bituminous Base Flashing
HW-15 (T) TPO Wall Covering with Bituminous Base Flashing
HW-15 (T-ALT) TPO Wall Covering with Bituminous Base Flashing
HW-20 (WH) Gypsum Wall on Metal Studs >24” w/ Coping
HW-20 (WL) Gypsum Wall on Metal Studs <24” w/ Coping
HW-24 Venting Lightweight Concrete
HW-25 (LB) Optional Two-Ply Base Flashing for Load-Bearing Masonry Wall w/ Counterflashing
CBE-1 (LB) Masonry With Nailing Facilities
CBE-2 (LB) Two Ply Base Flashing for LB Masonry for LB Masonry Wall Counter Flashing
CBE-2 Base Flashing with Surface Mounted Counter Flashing
CBE-3 (HW) BASE FLASHING FOR WOOD WALL +24 INCHES WITH COPING
CBE-3 (LW) BASE FLASHING FOR WOOD WALL -24 INCHES WITH COPING
CBE-6 (TH) BASE FLASHING +24 INCHES WITH COPING ALT
CBE-6 (TL) BASE FLASHING FOR MASONRY WALL -24 INCHES WITH COPING
CBE-15 SINGLE PLY WALL COVERING WITH BIT BASE FLASHING
PMF-7 PermaFlash® Through-Wall Scupper Detail
PMF-7S PermaFlash® Through-Wall Scupper Scrim Detail
VB-1 JM Vapor Barrier SA - Wall Base Detail
VB-1 (ALT) JM Vapor Barrier SA - Wall Base Detail (Alt)
VB-1 JM Vapor Barrier SAR - Wall Base
VB-1 JM Vapor Barrier SAR - Wall Base (ALT)
SPL-EJ-01 Expansion Joint TPO or PVC Roof to Wall
SPL-FW-01 Wall Mounted Ladder TPO or PVC Base Flashing
SPL-FW-03 Deck Mounted Ladder TPO or PVC Base Flashing
SPL-FW-05 Flashing Wall Optional Terminations
T-FW-B10 TPO Self Adhered Base Tie-In (Fastener & Plate) On Wall
T-FW-B13I TPO Fleece backed in RSUA Base and Wall Flashing
T-FW-B14I TPO Fleece Backed Base and Wall in Two Part UIA Spatter
T-FW-B4 Base Tie-In Fastener & Plate on Wall
T-FW-B7 Base Tie-in Knee Wall Brace 2/12 Slope
T-DV-03 Through-wall Scupper
T-DV-03I Through-wall Scupper
T-DV-05 Low-Wall Primary Scupper Flashing
T-EJ-01 Expansion Joint-Roof To Wall
T-EJ-04 Expand-O-Flash Roof To Wall-Style EJ
T-EJ-06 Expand-O-Flash Curb To Wall Expansion Joint Cover-Style CF/EJ
T-EJ-07 Expand-O-Flash Curb to Wall (Style TPO EJ-WC)
T-EJ-09 Expand-O-Flash Curb to Wall Expansion Joint Cover-Style CF/EJ
T-FC-06 TPO Flashing Wall with Term Bar and Corner Coping
T-FW-I11 TPO Intermediate Termination Below Wall Cladding
T-FW-I2 TPO Cover Strip Wall Flashing Attachment with Fastener & Plate
T-FW-I9 TPO Intermediate Termination with Through-Wall Counterflashing
T-FW-M1 TPO Base & Wall Flashing with Coping Master Detail
T-FW-M1I TPO Base & Wall Flashing with Coping Isometric View Master Detail
T-FW-M3I TPO Self Adhered Base & Wall Flashing with Coping Isometric View
T-FW-M4I TPO Base and Wall Flashing with Coping ISO View
T-FW-M5I TPO RhinoBond Wall Flashing ISOmetric View
T-FW-M6I TPO Rhinobond Wall Flashing ISO Metric View
T-FW-M7I TPO Base and Wall Flashing 10 FT Max with Coping
T-PT-08 Lightning Rod-Wall Mount
T-PT-12 JM ENRGY Anchor - TPO
T-PT-13 Hurricane Peel Stop Anchor Bar
T-FW-B10 TPO Self-Adhered Base Tie-In (Fastener & Plate) on Wall
T-FW-M3I Self-Adhered TPO Base & Wall Flashing with Coping ISO View
T-FW-M8I TPO Self-Adhered Continuous Wall Flashing
T-FW- T1 Fabricated Metal Coping Over Adhered TPO
T-FW- T2 Presto Lock Coping System Over TPO
T-FW- T3 Presto-Tite Fascia System On Sloped Parapet
T-FW- T4 Perma-Tite Continuous Cleat Coping System Over TPO
T-FW- T5 Top of Wall Termination with Stone Coping
TWE-DV-03 - Through-Wall Scupper with JM White EPDM
TWE-FW-01 - TPO End Wall Transistion with JM White EPDM
TH-FW-B3 - Base Tie In (Fastener & Plate) On Wall
TH-FW-M1 - TPO Hybrid Base & Wall Flashing with Coping Master
TH-FW-M1I - Hybrid Base & Wall Flashing with Coping Isometric View
VB-1 (ALT) JM Vapor Barrier SA - Wall Base Detail - Alt
VB-1 JM Vapor Barrier SA - Wall Base Detail
VB-1 (ALT) JM Vapor Barrier SAR - Wall Base
VB-1 JM Vapor Barrier SAR - Wall Base